Atelier
A fictional practice working across adaptive reuse and new construction. Six projects follow as full-screen chapters, printed in a single duotone — one ink, one oxide — because a body of work should read as one argument, not six moods.
Scroll, or use the chapter index at the right edge ↓
01 — Porto, PT
Meridian Archive
Archive & reading room · board-formed concrete · completed 2023
Project file
- Program
- Archive & reading room
- Status
- Completed 2023
- Structure
- Board-formed concrete
- Area
- 2,400 m²
02 — Uppsala, SE
Stationsgatan 9
Mass-timber offices · glulam frame, CLT decks · completed 2025
Project file
- Program
- Mass-timber offices
- Status
- Completed 2025
- Structure
- Glulam frame, CLT decks
- Area
- 6,100 m²
03 — Valencia, ES
Casa Umbral
Housing, 44 units · in-situ concrete slabs · completed 2021
Project file
- Program
- Housing, 44 units
- Status
- Completed 2021
- Structure
- In-situ concrete slabs
- Area
- 5,300 m²
04 — Rotterdam, NL
The Long Gallery
Civic hall renovation · retained frame, new core · completed 2019
Project file
- Program
- Civic hall renovation
- Status
- Completed 2019
- Structure
- Retained frame, new core
- Area
- 3,700 m²
05 — Bergen, NO
Aldervik Baths
Bathhouse & sauna · lime-washed masonry · in construction
Project file
- Program
- Bathhouse & sauna
- Status
- In construction
- Structure
- Lime-washed masonry
- Area
- 900 m²
06 — Leeds, UK
Kiln Row
Studios in a former kiln · retained brick, steel inserts · completed 2024 · expanded below
Project file
- Program
- Studios in a former kiln
- Status
- Completed 2024
- Structure
- Retained brick, steel inserts
- Area
- 1,850 m²
06 — expanded
Kiln Row, Leeds
Adaptive reuse begins with an inventory, not a sketch. The former kiln offered three things worth keeping: a brick envelope with a metre of thermal mass, a sawtooth roof throwing north light — the flat, shadowless light studios want — and a structural grid generous enough to accept new floors without touching the walls.
Everything new is legible as new. Weathering-steel inserts carry two mezzanine levels and stop short of the brick on every side, so the original envelope stays readable end to end. Services run exposed in the gap. Where openings were cut, the reveals are lined in the same steel — the building keeps a record of its own alterations.
The sustainability argument is arithmetic before it is virtue: retaining the shell saved the carbon of roughly 1.1 million bricks (a figure from this fictional project's fictional audit — the reasoning, however, is how real reuse gets justified). The cheapest structure is the one already standing.
- Client
- Kiln Row CIC
- Program
- 28 maker studios, gallery
- Area
- 1,850 m² gross
- Structure
- Retained brick; weathering-steel mezzanines
- Light
- North-facing sawtooth roof, reglazed
- Completed
- 2024